As one of professional manufacturer in China, YueLi would like to provide you CNC High-Speed Drilling Equipment. And we will offer you the best after-sale service and timely delivery.
YueLi, a reputable manufacturer in China, is willing to offer you CNC High-Speed Drilling Equipment. We promise to provide you with the best after-sale support and prompt delivery.
1. Integral casting bed
2. High-speed PLC control system
3. High strength spindle unit
4. Rigid direct coupling
5. ER32 chuck
6. Ac servo power amplifier and motor
7. Yintai linear track
8. High-pressure cooling system
9. Automatic lubrication system
10. Hydraulic clamping
11. Hand pulse generator
12. Fully enclosed sheet metal
13. Screw full protection
fourteen System operation manual.
One year warranty (manpower and spare parts)
Maximum bore diameter on the machine |
φ12mm |
Minimum bore diameter on the machine |
φ5mm |
Maximum workpiece clamping diameter of the machine |
φ60mm |
Minimum clamping diameter of machine tool |
φ10mm |
Maximum workpiece clamping length |
260mm |
Maximum borehole length |
180mm |
Spindle speed (non-polar) |
3500rpm/min |
Hydraulic clamping cylinder |
40X20 |
Maximum travel of the feed shaft |
240mm |
Fast movement speed of the feed shaft |
7m/min |
Feed shaft motor torque |
1307N/M |
Feed shaft linear guide |
30滚珠 |
Feed shaft lead screw |
3210 |
Repeated positioning accuracy |
±0.06mm |
Positioning accuracy |
±0.05mm |
Main motor power |
5.5KW |
Overall dimensions (L X W X H) |
1730X1200X1620mm(不含排销机) |
Machine weight |
约1500KG |
Parts and components |
Producing country |
label |
Linear guide |
China |
Kate/Intime |
Main shaft bearing |
China |
The Great Wall |
Ball screw support bearing |
China |
The Great Wall |
Ball screw |
China |
Intime |
relay |
China |
Delixi or Tenzheng |
contactor |
China |
Delixi or Tenzheng |
Plc controller |
China |
Credit card |
Main motor |
China |
Be open to navigation |
Feed servo amplifier |
China |
Credit card |
Feed servomotor |
China |
Credit card |
Note: The seller has the right to replace the same parts if the parts supplier does not deliver in time
1. Installation and commissioning
After the machine tool is delivered to the Demander site, the Demander shall be responsible for the foundation, unloading, lifting, unpacking and positioning of the machine tool. After the machine tool is in place, the Demander shall notify the supplier in writing or by telephone to carry out the fine adjustment level, debugging and static accuracy inspection of the machine tool on the site of Party A (the inspection items shall be carried out according to the above provisions). The supplier shall bear the difference and accommodation expenses during the commissioning period.
2. Warranty period and scope
The quality guarantee period is 12 months from the date of arrival.
During the quality guarantee period, the supplier shall provide the Demander with timely maintenance services and necessary spare parts free of charge.
The appearance or internal damage of the machine due to improper operation and self-disassembly and modification caused by non-manufacturing quality reasons as well as excessive storage time are not covered by the above warranty, and the customer shall pay the relevant maintenance costs.
Upon receiving the notice from the demander, the supplier shall reply within 4 hours during working hours and within 24 hours during other times. When it is necessary to send personnel to the demander for on-site processing, the technical service engineer in the technical service center of our company located in the area shall be responsible for ensuring timely service. After the warranty period, the supplier will still provide online services and technical guidance free of charge. Provide timely supply of spare parts to customers at favorable prices. When it is necessary to send personnel to the site for maintenance, the corresponding travel costs and working hours will be charged according to the supplier's standards.
Step 3: Training
After the Contract comes into force, the Supplier shall provide the Demander with a 2-day training program at Party B's factory free of charge. The travel expenses and accommodation expenses shall be borne by the Supplier. Make an appointment with the supplier before training.
The supplier shall complete the commissioning and acceptance of the machine tool at the site of the Demander, and provide the Demander with 1-day on-site training on the operation and maintenance of the machine tool.